Three Waters / PROJECT

Hakanoa Street Stormwater Renewal.

Complex Auckland stormwater works, including pipelines, manholes, catchpits and deep excavations in a constrained urban environment.

Let's talk about your project
Location
Auckland
Client / project context
Contract client: CDS; asset owner: Auckland Council Healthy Waters
Delivery role
Civil delivery / subcontract delivery
Period
2025–2026
Disciplines
Three Waters / Project Delivery
Status
Completed

The project

Stormwater infrastructure renewal in an established Auckland street. Livic's civil delivery scope included pipelines, manholes, catchpits and the associated excavation and reinstatement interfaces.

The challenge

Underground work within a constrained urban environment, with existing services, property access, mature trees and stakeholder interfaces. Excavations and manholes reached approximately 5 metres in parts.

Livic's scope

Civil and subcontract delivery of the non-drilled construction scope. Specialist horizontal directional drilling interfaces for laterals and tree protection formed part of the wider project context.

Key works

The supplied project evidence records approximately 400 metres of stormwater main, 133 metres of catchpit leads, 11 manholes and 27 catchpits.

  • Stormwater pipe installation and connection interfaces
  • Manhole and catchpit construction
  • Deep excavation and temporary-works interfaces
  • Urban service, access and reinstatement coordination

Construction approach

Excavation, pipe and chamber installation, service interfaces and reinstatement were coordinated through a staged urban work sequence. Existing services and property access shaped the work.

Quality

Drainage handover centred on installation checks, testing and as-built evidence for the network.

Safety

Deep excavations, lifting, live services and public access required careful work planning throughout the project.

Environment

Tree-protection interfaces and trenchless lateral work formed part of the construction constraints. No environmental outcome is claimed here.

Stakeholders

Work was coordinated around service owners, street access and affected properties. CDS was the contract client and Auckland Council Healthy Waters the asset owner.

Outcome

Completed over 2025–2026, the scope included approximately 400 metres of stormwater main, 133 metres of catchpit leads, 11 manholes and 27 catchpits. Excavations reached approximately 5 metres in parts.

HAKANOA STREET / BY THE NUMBERS

400 m

Approx. stormwater main

133 m

Approx. catchpit leads

11

Manholes

27

Catchpits

5 m

Approx. maximum depth

Project-specific quantities from the supplied brief. Approximate where noted.

NEXT PROJECT

Solar Farm Civil Works

START A CONVERSATION

HAVE A PROJECT?
LET'S BUILD IT.

If you have civil work coming up in Auckland, talk to us early.

Talk to Livic enquiries@liviccivil.co.nz027 406 2789